Project: ONE BLOOD

Fort Lauderdale, Florida
Structural hardening of this 80’s era office building to resist a Cat 5 hurricane. The scope also included exterior and interior alterations of the three story,76,000 sq ft facility.

Structural System: Precast pre-stressed composite keystone joints and cast in place slab roof and elevated floor framing, concrete frame with CMU shear walls, and a shallow foundation.